Foreword
Preface
List of Figures
List of Tables
1 Before You Begin
1.1 Introduction
1.2 Standards
1.2.1 Standard Drawings
1.2.2 Charts
1.2.3 Drawing Templates and Drawing Standards
1.2.4 Drawing Numbering
1.2.5 3-D Model Numbering
1.2.6 Material Commodity Codes
1.3 Specifications
1.3.1 Piping Classes
1.4 Procedures
1.4.1 Stick Files
1.4.2 Inter-discipline Drawing Reviews
1.4.3 Line Numbering
1.4.4 Stress Analysis
1.4.5 CAD Set-up
1.4.6 3-D Model Reviews
1.4.7 Checking
1.4.8 Manhour Estimating
1.4.9 Progress Reporting
1.4.10 Management of Change
1.4.11 As-Builting
1.4.12 Project Close-out
1.5 Piping Execution Plan
1.5.1 Design Basis Memorandum (DBM)
1.5.2 Project Execution Plan (PEP)
1.5.3 Contracting and Procurement Plan and Construction Execution Plan
1.6 Conclusion
2 Procedures
2.1 Introduction
2.2 Master Stick Files, Working Copies, and Inter-Discipline Drawing Reviews (IDR)
2.2.1 Master Stick Files
2.2.2 Working Copies
2.2.3 Inter-Discipline Drawing Reviews
2.3 Vendor Drawing Reviews
2.4 Line Numbering
2.4.1 Line Numbering Rules
2.5 Stress Analysis
2.5.1 The Stress Analysis Procedure
2.5.2 Stress Analysis Procedure Notes
2.6 Model Reviews
2.6.1 Model Review Procedure
2.6.2 Model Review Matrix
2.7 Checking
2.7.1 Clash Check Reporting Procedure
2.7.2 Equipment Checking Procedure
2.7.3 Piping Arrangement and Isometric Checking
2.7.4 Prerequisites and Checking Procedure
2.8 Manhour Estimating and Manpower Planning
2.8.1 Manhour Estimating
2.8.2 Manpower Planning
2.8.3 Other Considerations
3 Deliverables
3.1 Introduction
3.2 Deliverables
3.2.1 Cover Sheets and Drawing Indexes
3.2.2 Plot Plan
3.2.3 Key Plans
3.2.4 Location Plans
3.2.5 Piping Arrangements
3.2.6 Isometrics
3.2.7 Isometric Logs
3.2.8 Tie-in Isometrics
3.2.9 Tie-in List
3.2.10 Demolition Drawings
3.2.11 Heat Tracing Circuit Layouts
3.2.12 Heat Tracing Logs
3.2.13 3-D Models
3.2.14 Model Indexes
3.2.15 CWP Drawing Packages and Scopes of Work (SOW)
3.2.16 Process Flow Diagrams (PFDs)
3.2.17 Piping and Instrumentation Diagrams (P&IDs)
3.2.18 Line Designation Tables (LDTs)
4 Detailed Design
4.1 Introduction
4.2 Contracting and Procurement Plan and Construction Execution Plan
4.3 Modularized and Field Erected Piping Splits and CWP Boundaries
4.3.1 Notes to Figure 4-1
4.4 Model Boundaries
4.4.1 Study Model Boundaries
4.4.2 Detailed Model Boundaries
4.5 Shop and Field Material Splits
4.6 Procurement Splits
4.7 Issued For Bid and Bid Evaluations
4.7.1 Issued for Bid
4.7.2 Clarifications from Bidders and Bid Evaluations
4.8 Equipment Coordinates and Elevations
4.9 Module Design
4.9.1 Design Considerations
4.10 Module Numbering
4.11 Drafting Practice
4.11.1 A Brief History
4.11.2 3-D CAD Drafting Practice
4.11.3 Ownership and Training
4.11.4 Piping Arrangements
4.11.5 Isometrics
4.12 Holds
4.13 Project Binders and Lists
4.13.1 Project Binders
4.13.2 Piping Job Notes and CAD Job Notes
4.13.3 Action Item List and Needs List
4.13.4 Equipment List
4.13.5 Data Sheets
4.14 Managing Standard Drawings
4.15 Project Meetings
4.16 Progress Monitoring
4.17 Design Change Notice (DCN)
4.18 Field Change Notice (FCN)
4.19 Request For Information (RFI)
5 Shop Fabrication
5.1 Introduction
5.2 Kick-off Meetings
5.3 Scopes of Work (SOW)
5.3.1 Example of Pipe Spool Fabrication Scope of Work
5.3.2 Example of Module Fabrication and Assembly Scope of Work
5.4 Instruction to the Fabricator
5.4.1 Example of Instruction to Fabricator
5.5 Requests For Information (RFI)
5.6 Visits with the Fabricators
5.6.1 The Value of Shop Visits
5.6.2 Supporting the Fabricators
5.7 Automatic Spool Generation
5.8 Conclusion
6 Field Construction
6.1 Introduction
6.2 Support from the Home Office
6.2.1 Kick-off Meetings
6.2.2 Field Erection of Piping Scope of Work
6.2.3 Computers, 3-D Software Set-ups, and Maintenance
6.2.4 Request for Information
6.3 Support in the Field
6.3.1 Utilizing the 3-D Models
6.3.2 Problem Solving
6.3.3 Punch Lists and Deficiency Reports
6.3.4 Compiling and Submitting RFIs
6.3.5 Investigating Back Charges and Extras
6.3.6 Progress Monitoring
6.3.7 Maintaining the Master Stick Files
6.3.8 As-Builting
6.4 Lessons Learned
6.5 Safety
Abbreviations
Index