Chappell | The JCT Intermediate Building Contracts 2005 | Buch | 978-1-4051-4049-2 | sack.de

Buch, Englisch, 400 Seiten, Format (B × H): 179 mm x 254 mm, Gewicht: 822 g

Chappell

The JCT Intermediate Building Contracts 2005


3. Auflage 2006
ISBN: 978-1-4051-4049-2
Verlag: Wiley-Blackwell

Buch, Englisch, 400 Seiten, Format (B × H): 179 mm x 254 mm, Gewicht: 822 g

ISBN: 978-1-4051-4049-2
Verlag: Wiley-Blackwell


The 2005 version of the JCT Intermediate Building Contract has introduced a very different looking contract format and a number of changes to contract conditions. A completely new Intermediate Building Contract with Contractor's Design has also been issued.




This well established guide, which has been thoroughly updated, looks at the changes and key aspects of both forms, and takes account of new case law since the last edition of the book published in 1999. It also discusses the new subcontract agreements.

Chappell The JCT Intermediate Building Contracts 2005 jetzt bestellen!

Autoren/Hrsg.


Weitere Infos & Material


Preface to the third edition; Chapter 1 The Purpose and Use of IC and ICD; 1.1 The background; 1.2 IC documentation; 1.3 The use of IC; 1.4 Completing the form;Chapter 2 Contracts Compared; Chapter 3 Contract Documents and Insurance; 3.1 Contract documents; 3.1.1 Types and uses; 3.1.2 Importance and priority; 3.1.3 Errors; 3.1.4 Custody and copies; 3.1.5 Limits to use; 3.1.6 Notices; 3.2 Insurance; 3.2.1 Indemnity; 3.2.2 Injury to persons and property; 3.2.3 Things which are the liability of the employer; 3.2.4 Insurance of the Works: alternative clauses; 3.2.5 A new building where the contractor is required to insure; 3.2.6 A new building where the employer insures; 3.2.7 Alterations or extensions to an existing building; 3.2.8 Benefits for subcontractors; 3.2.9 Joint fire code; 3.2.10 Terrorism cover; 3.3 Summary; Chapter 4 The Architect's Authority and Duties; 4.1 Authority; 4.1.1 General; 4.1.2 Express provisions; 4.1.3 The issue of instructions: general; 4.1.4 Instructions in detail; 4.2 Duties; 4.2.1 Duties under the contract; 4.2.2 General duties; 4.3 Summary; Chapter 5 The Contractor's Obligations; 5.1 Express and implied obligations; 5.1.1 Legal principles; 5.1.2 Execution of the Works; 5.1.3 Workmanship and materials; 5.1.4 Statutory obligations; 5.1.5 Person-in-charge; 5.1.6 Levels and setting out; 5.2 Other obligations; 5.2.1 Access to the Works and premises; 5.2.2 Drawings, details and information; 5.2.3 Compliance with architect's instructions; 5.2.4 Suspension of performance; 5.2.5 Other rights and obligations; 5.3 Summary; Chapter 6 The Employer's Powers, Duties and Rights; 6.1 Express and implied powers and duties; 6.1.1 Co-operation or non-interference; 6.2 Rights; 6.2.1 General; 6.2.2 Deferment of possession of the site; 6.2.3 Deduction/repayment of liquidated damages; 6.2.4 Employment of direct contractors; 6.2.5 Rights as to insurance; 6.3 Duties; 6.3.1 General; 6.3.2 Payment; 6.3.3 Retention; 6.3.4 Other duties; 6.4 Summary; Chapter 7 The Clerk of Works; 7.1 Appointment; 7.2 Duties; 7.3 Responsibility; 7.4 Summary; Chapter 8 Subcontractors and Suppliers; 8.1 General; 8.2 Subcontractors; 8.2.1 Assignment and subcontracting; 8.2.2 Named persons as subcontractors; 8.3 Statutory authorities; 8.4 Work not forming part of the contract; 8.5 Third part rights and collateral warranties; 8.6 Summary; Chapter 9 Possession, Practical Completion and Defects Liability; 9.1 Possession; 9.1.1 General; 9.1.2 Date for possession; 9.2 Practical completion; 9.2.1 Definition; 9.2.2 Consequences; 9.2.3 Partial possession and sectional completion; 9.3 Rectification period; 9.3.1 Definition; 9.3.2 Defects, shrinkages or other faults; 9.3.3 Frost; 9.3.4 Procedure; 9.4 Summary; Chapter 10 Claims; 10.1 General; 10.2 Extension of time; 10.2.1 Legal principles; 10.2.2 Liquidated damages; 10.2.3 Procedure; 10.2.4 Grounds; 10.3 Loss and expense claims; 10.3.1 Definition; 10.3.2 Procedure; 10.3.3 Matters grounding a claim; 10.4 Summary; Chapter 11 Payment; 11.1 The contract sum; 11.2 Payment before practical completion; 11.2.1 Method and timing; 11.2.2 Valuation; 11.2.3 Amounts included; 11.3 Payment at practical completion; 11.4 Retention; 11.5 Final payment; 11.6 The effect of certificates; 11.7 Withholding payment; 11.8 Variations; 11.9 Valuation of contractor’s designed portion; 11.10 Fluctuations; 11.11 Summary; Chapter 12 Termination; 12.1 Termination by the employer; 12.1.1 General; 12.1.2 Grounds (clause 8.4.1): contractor's defaults; 12.1.3 Grounds (clause 8.5): insolvency of contractor; 12.1.4 Grounds (clause 8.6): corruption; 12.1.5 Grounds (clause 8.11): neutral causes; 12.1.6 Grounds (paragraph C.4.4 of schedule 1 and clause 6.10.2.2): insurance risks and terrorism cover;12.1.7 Consequences (clauses 8.5.3, 8.7 and 8.8); 12.1.8 Consequences (clauses 8.11 and paragraph C.4.4 of schedule 1); 12.2 Termination by the contractor; 12.2.1 General; 12.2.2 Grounds (clause 8.9): employer's faults; 12.2.3 Grounds (clause 8.10): insolvency; 12.2.4 Grounds (clause 8.11): neutral causes; 12.2.5 Grounds (paragraph C.4.4 of schedule 1 and clause 6.10.2.2): insurance risks and terrorism cover; 12.2.6 Consequences (clause 8.12); 12.2.7 Consequences (paragraph C.4.4 of schedule 1 and clause 6.10.2.2); 12.3 Summary; Chapter 13 Contractor’s designed portion (CDP); 13.1 General; 13.2 Documents; 13.3 The contractor’s obligations; 13.4 Liability; 13.5 Variations; 13.6 Insurance; 13.7 Summary; Chapter 14 Dispute Resolution Procedures; 14.1 General; 14.2 Adjudication; 14.2.1 The contract provisions; 14.2.2 The Scheme: notice of adjudication; 14.2.3 The Scheme: appointment of the adjudicator; 14.2.4 The Scheme: procedure; 14.2.5 The Scheme: adjudicator’s powers and duties; 14.2.6 The Scheme: the adjudicator’s decision; 14.2.7 The Scheme: costs; 14.3 Arbitration; 14.3.1 General; 14.3.2 Procedure; 14.3.3 The appointment of an arbitrator; 14.3.4 Counterclaims; 14.3.5 Powers of the arbitrator; 14.3.6 Third party procedure; 14.4 Legal proceedings; 14.5 Summary;.
Appendix A Intermediate Named Sub-Contractor Tender and Agreement (ICSub/NAM/IT), (ICSub/NAM/T), (ICSub/NAM/A); Appendix B Intermediate Named Sub-Contract Conditions (ICSub/NAM/C);Appendix C Intermediate Named Sub-Contractor/Employer Agreement; (ICSub/NAM/E); Table of Cases; Clause Number Index to Text; Subject Index.


David Chappell BA(Hons Arch), MA(Arch), MA(Law), PhD, RIBA has worked as an architect in the public and private sectors and is currently the Director of David Chappell Consultancy Ltd. He frequently acts as an adjudicator and is author of ten books on construction law for Blackwell Publishing.



Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.