Ellingham / Fawcett | New Generation Whole-Life Costing | E-Book | sack.de
E-Book

E-Book, Englisch, 224 Seiten

Ellingham / Fawcett New Generation Whole-Life Costing

Property and Construction Decision-Making Under Uncertainty
Erscheinungsjahr 2007
ISBN: 978-1-134-27920-3
Verlag: CRC Press
Format: PDF
Kopierschutz: Adobe DRM (»Systemvoraussetzungen)

Property and Construction Decision-Making Under Uncertainty

E-Book, Englisch, 224 Seiten

ISBN: 978-1-134-27920-3
Verlag: CRC Press
Format: PDF
Kopierschutz: Adobe DRM (»Systemvoraussetzungen)



New Generation Whole-Life Costing presents an innovative approach to decision-making and risk management for construction and real estate. It applies the options-based approach that has revolutionized the management of uncertainty in the business world. Based on government-sponsored research at Cambridge Architectural Research Ltd., the book introduces the idea of 'lifecycle options'.

The desirability of whole-life costing is widely accepted, but take-up levels have been low. One problem is that traditional techniques fail to take account of future uncertainty. In contrast, the new options-based approach considers a diversity of possible futures, and favours flexible strategies that incorporate lifecycle options. This approach leads to more cost-effective and sustainable decisions, minimizing the risk of under- or over-investment.

This book is structured around realistic case studies that demonstrate the prevalence of lifecycle options. These case studies are backed up by clear presentation of basic principles and mathematical techniques allowing the book to be read either as a stimulating introduction to new concepts, or as a guide to mathematical methods.

Ellingham / Fawcett New Generation Whole-Life Costing jetzt bestellen!

Weitere Infos & Material


1. The Rationale for Project Evaluation 2. Evaluating Long Term Projects 3. Evaluating Risk Projects 4. Data for Whole-Life Costing 5. Lifecycle Options 6. The Option to Develop 7. The Option to Expand 8. The Option to Switch Use 9. The Option to Reconfigure 10. The Option to Refurbish 11. Options on New Technology 12. Very Long Term Projects 13. Long-Term Budgeting under Uncertainty 14. Self-Assessment Matrix for Whole-Life Evaluation. Where to Find Out More


Ian Ellingham is an associate of Cambridge Architectural Research Ltd., UK.

William Fawcett has held a lectureship at the University of Hong Kong and was one of the founding directors of Cambridge Architectural Research Ltd. He holds the Chadwick Fellowship in Architecture at Pembroke College, Cambridge.



Ihre Fragen, Wünsche oder Anmerkungen
Vorname*
Nachname*
Ihre E-Mail-Adresse*
Kundennr.
Ihre Nachricht*
Lediglich mit * gekennzeichnete Felder sind Pflichtfelder.
Wenn Sie die im Kontaktformular eingegebenen Daten durch Klick auf den nachfolgenden Button übersenden, erklären Sie sich damit einverstanden, dass wir Ihr Angaben für die Beantwortung Ihrer Anfrage verwenden. Selbstverständlich werden Ihre Daten vertraulich behandelt und nicht an Dritte weitergegeben. Sie können der Verwendung Ihrer Daten jederzeit widersprechen. Das Datenhandling bei Sack Fachmedien erklären wir Ihnen in unserer Datenschutzerklärung.